Rail & Transportation AI: Track Safety, ROW Monitoring & Rolling Stock Predictive Maintenance

Built for infrastructure directors, safety managers, rolling stock operations teams

31% fewer track incidents, 40% faster ROW clearance, and thermal failures caught before service disruption—no wayside system replacement.

Computer vision and predictive analytics for rail infrastructure safety, right-of-way monitoring, and rolling stock thermal monitoring. FRA-compliant deployments reduce track incidents by 31% and accelerate ROW clearance by 40%—without replacing wayside systems.

Quick-win solutions

RailGuard

Right-of-way monitoring & clearance

  • Vegetation encroachment detection with GPS mapping
  • Clearance violation alerts (structure gauge, overhead)
  • Work order generation with severity scoring

What you get:

Encroachment detection model · GIS violation layer · CMMS adapter · Scan report scheduler

60–90 days

TrackSentinel

Track defect detection (rail, ties, ballast)

  • Defect classification (cracks, wear, ballast fouling)
  • Priority scoring by defect severity and traffic volume
  • Inspection log export for FRA compliance

What you get:

Defect detection model · Severity scorer · FRA inspection logs · Wayside integration

60–90 days

FleetTherm

Rolling stock thermal monitoring

  • Thermal anomaly detection on wheels, bearings, brakes
  • Pre-failure alerts with component-level tracking
  • Depot integration for scheduled interventions

What you get:

Thermal anomaly model · Failure prediction · Depot queue integration · KPI dashboard

60–90 days

SignalEye

Signal & switch monitoring

  • Signal aspect verification from wayside cameras
  • Switch position confirmation with anomaly alerts
  • PTC integration for automated fault reporting

What you get:

Signal verification · Switch tracker · PTC API · Alert rules

60–90 days

How it works

PoC
2-4 weeks
Validate feasibility
Pilot
6-8 weeks
Prove ROI on limited scope
Scale
Quarterly
Expand across facility

Products used

SENTRA

Edge CV for wayside cameras and depot thermal imaging; low-latency inference for real-time alerts

Data & Analytics Platform

CMMS integration (Maximo, SAP PM), GIS mapping, FRA reporting

Tech & deployment

  • Infrastructure: Wayside cameras (visible + thermal) with edge compute (Jetson/x86), depot-mounted thermal arrays
  • Integration: CMMS/EAM (Maximo, SAP PM, Infor EAM), GIS (Esri ArcGIS, LRS), PTC (Wabtec, Alstom, Siemens)
  • Deployment: Cloud for Class II/III carriers, on-prem for Class I railroads, hybrid edge+cloud analytics

Rail Governance & Compliance

  • Chain-of-custody: All defect evidence includes GPS, timestamp, camera ID, and inspector override audit trail
  • Retention windows: Configurable retention (90 days to 7 years) with automated archival to cold storage
  • Access control: Role-based permissions (inspector, supervisor, compliance officer) with MFA enforcement
  • Incident reporting: Automated FRA Part 213 compliance logs with one-click export for safety audits

ROI & proof

31% fewer track incidents

Regional freight railroad reduced track-caused derailments from 13 to 9 annually using TrackSentinel for defect prioritization

40% faster ROW clearance

Commuter rail system cleared 160 vegetation violations in 45 days (vs. 75 days historical) with RailGuard automated work orders

Methodology

Frequently Asked Questions

Last updated: January 15, 2025

Case Study

31% fewer track incidents in 8 months

Regional freight railroad reduced track-caused derailments using TrackSentinel for defect prioritization and RailGuard for ROW clearance automation.

TrackSentinel
RailGuard
SENTRA Edge
31%
Fewer incidents
40%
Faster clearance

Ready to get started?

Schedule a 30-minute call with our solution architects to discuss your specific challenges.

Procurement team? Visit Trust Center